Addendum

Type the addendum as drafted by the Engineer.

A letter should be sent to each of the Contractors/Suppliers that have taken out Plans and Specifications. This letter will transmit two (2) copies of the addendum to each of the above mentioned Contractors/Suppliers. These Contractors/Suppliers are instructed to return one (1) copy of the Addendum as soon as possible and to submit one (1) copy with their bid.

  • Send these items - CERTIFIED/RETURN RECEIPT REQUESTED
  • SEE FORM LETTER SECTION (Page 74)

On the Plans and Specifications Issued Form, when the Addendums are returned, check off that we have received them from the Contractors/Suppliers. Also mail one (1) copy of the addendum to the Town.

  • SEE FORM LElTER SECTION (Page 75)